Find the earliest completion time and the new critical path if task T5 is reduced to time length 7.

Give the earliest completion time as a whole number.

Respuesta :

Otras preguntas

An ant looks to the top of a bulding at an angle of elevation of 32°. The ant then walks an additional 66 feet from the edge of the building. If the new angle o
List all of the number sets that contain the number 3/2 A. rational numbers only B. rational numbers and integers C. rational numbers and natural numbers D.
9times 27 plus 2 times 31 minus 28
What is common to all elements in the same group in the periodic table? A. They have the same number of neutrons. B. They are all nonmetals. C. They have th
What is the volume of a ball if the diameter if the ball is 6 inches? Leave your answer in terms of π. A) V = 12 π cubic inches B) V = 36 π cubic inches C) V
Silver has a density of 10.5g/cm to the 3rd and gold has density of 9.3g/cm to the 3rd. Which would have a greater mass, 5cm to the third of silver or 5cm to th
What are the factors for 7?
Enrollment at Roosevelt Middle School is being reviewed by the school staff. The table gives the numbers of boys and girls in grades 6 to 9. Grade Girls Boys 6
In which step of the diagram does the virus release a protein that causes the cell wall to burst? step C step D step E step F
convert 22 Australian dollars to US dollars? Assume 1.2 Australian dollars equals 1 US dollar