autumperry7040 autumperry7040
  • 15-02-2024
  • Engineering
contestada

Architectural drawings usually include a table called a window schedule that lists the manufacturer, unit size, and the rough opening (R.O.). If an R.O. for a given window was listed as 2'-10" x 3'-4" , the actual height of the framed opening is _____________. a) 2 feet 10 inches
b) 3 feet
c) 3 feet 4 inches
d) 3 feet 10 inches

Respuesta :

Otras preguntas

ANSWER QUICK FOR BRAINIEST! Solve the equation for x. −0.28x − 15.3 = 1.92 x = 61.5 x = −61.5 x = 47.8 x = −47.8
Domain and range of the quadratic function F(x)=-4(x+6)^2-9
REQUIREMENTS OVERVIEW -The requirements below are for Finance, Procurement and Information Technology. The SOW should cover the needs the of the business, howev
Factor the following perfect square trinomials.
The temperature of the paradichlorobenzene is always a little higher than the temperature of the water. Why? ​
find the x and y intercepts y-3x=18
1. Ang CBDRRM Approach ay isang proseso ng paghahanda. Upang maging matagumpay ang ng pagbabahagi ng kaalaman at tulong sa mga maaapektuhan. CBDRRM Approach nan
please help me pls help me ​
HELPPPPP SAT QUESTION
1. Explain why climate modelers can never be certain of their predictions: