sy1524574 sy1524574
  • 15-02-2024
  • Mathematics
contestada

4. The efficiency of A is 20% more than B. If both mills can work in 24 days, how much time will each of them take to complete the work?​

Respuesta :

Otras preguntas

Nevada company paid to the state $1,800 in sales tax that it had previously collected from customers. what type of transaction was this?
name 6 communication blockers
Standard automobile license plates in a country display 2 numbers, followed by 2 letters, followed by 3 numbers. how many different standard plates are possible
what does pie equal in math
Zach spent 2/3 hour reading on friday and 1 1/3 hours reading on saturday how much more time did he read on saturday than on frifay
what industries are important to italy?
the russian ice breaker yamal can move foward through 2.3 meter-thick ice at a speed of 5.5 kilometers per hour. write and solve a multiplication equation to fi
why does the "The Monk's Tale" fit the category of parable?A. It is told with rhyme and rhythm  B. It focuses on biblical charactersC. It portrays people realis
What is the difference between dehydration and overhydration? why does swelling occur with overhydration? what symptoms are similar between these two conditions
Differentiate y=(r^2-9r)e^r