Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

what does TVET stand for?​
State Newton’s First Law
what does x=, im very stuck on this
express x in terms of a and b x/a+1=b
2.1.2 Make use of the distance formula to determine the length of PQ​
Listen Review section 3.6 to answer this question: The cabinet represented in Fig. 3.26 and 3.27, created by Daniel Pabst, was associated with: the Ming Dynasty
Write the balanced equation and determine the information requested. Don't worry about state symbols in these reactions. The number of moles and the mass (in mi
a second-grade math teacher is designing a lesson that will address the standard for number and operations. this lesson will focus on the use of standard word a
A constant force applied to object A causes it to accelerate at 6 m/s2. The same force applied to object B causes an acceleration of 3 m/s2. Applied to object
for each of the follwing situations write down the formula andd determine itf it defines a linear function