4. What aspect of the initial database planning process would the formula (0 + Pt × 3 + p)/5 be used in?

A. Time estimation
B. Budgeting
C. Workforce forecasting
D. Entity prediction

Respuesta :

becky71405
becky71405 becky71405
  • 15-01-2019
Time estimation makes the most since in this scenario
Answer Link

Otras preguntas

Location B is which place? Canaan Egypt Syrian Desert Mediterranean Sea
im sad and depressed because i just got called to the library to get told i didnt mke the team for the battle of the books
spade realty sold lots for $23240 per hectare . what is total sales values if the lots in hectare were 2,3,4 ?
9,835/63 what is the answer and what is the remainder
Water flows through a pipe at a rate of 7 liters every 9 days. Express this rate of flow in gallons per week. Round your answer to the nearest hundredth.
SECOND TIME ASKING HELP!!! 6. Jackie has n nickels and q quarters in her pocket. The total value of the coins is at least $24.75. Write an inequality that repre
Plants store _____ energy in their tissues. A mechanical B heat C light D chemical
Determine the solution for 72 = 3(5b − 1). b = 3.5 b = 4.6 b = 5 b = 14.2
Study the equations: f(x)=11x-5 g(x)=-2x-4 What is h(x) = f(x) g(x)
Jocelyn complied data on the number of hours students work per week the summer after senior year. The minimum number of hours is the distribution was 23. The ra