dannyd2310
dannyd2310 dannyd2310
  • 02-04-2019
  • Computers and Technology
contestada

Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Water regulates the earth's temperature? true or false
given that the length of the side of a square-based prism is 10 centimeter, and its volume is 1000 cubic centimeters, find its height.
If a system has exactly one solution it is called _______________.
During middle childhood, a new component of the self is added to the categorical, social, and emotional selves. this new component includes things like personal
If x−y=80 and 3/5 = y/x , then what is the value of x? (15 POINTS AND FREE BRAINIEST ANSWER!!)
Two trains leave a train station traveling different directions. The first train travels 12 miles west, then 6 miles north. The second train travels 20 miles ea
Jane is studying the rate at which the sale of a particular brand of chocolate has increased over the years. The graph below shows the number of bars sold y, in
Cuanto ____ estos zapatos? A) cuestan B) piensan C) quieren D) prefieren
An atom has six electrons, six protons, and six neutrons. You can tell that this atom belongs to the element _____ because _____________________. Question 1 opt
how long did it take women to win the right to vote, from women's earliest efforts toward that goal to the ratification of the 19th Amendment to the Constitutio