infernicalminecraft infernicalminecraft
  • 01-11-2019
  • Mathematics
contestada

To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

What are the dimensions and maximum area for a rectangular carpet that has a perimeter of 56 ft?
A random sample of adults was surveyed about whether they shop online. Of the 90 adults surveyed, 72 stated they shop online. What is the 99% confidence interva
An appeal is different from a trial because an appeal is an opportunity O for a jury to listen to evidence and reach a verdict. O for justices to review legal p
What is the verdict? In monster
Hey mutals lets talk for all ages no rude people Meet code is ID;985 1619 0213 Pas;B0H1UB
What characteristics of the United States does Douglass believe led to the war with Mexico?
Easiesy way to get rid of cramps? FEMALES ONLY PLEASE
Why was the bombing of Pearl Harbor a significant event during World War II? A.)It prevented Japan from invading the United States. B.)It put an end to the lend
help plzzzzzzzzzzzzzz-
Which graph represents the function f(x) = 4|x|? Which graph represents the function f(x) = 4|x|?