Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

How did materialistic vision get its start in gatsby?
Four wrestlers step on a scale for a tournament. Wrestler A weighs in at 170 pounds; wrestler B weighs in at 168 pounds; wrestler C weighs in at 171 pounds;
Nuclear fission occurs when an atomic nucleus splits into two or more smaller and less massive atomic nuclei. TRUE FALSE
What is a codex-style of painting ?
Why does a throw football have both potential and kinetic energy? What is the combined energy called? ( Please explain )
The most complex organic compounds are the _________. a. carbohydrates b. proteins c. lipids
From the list of the instructions and tips below, select the statement that would not lead to a successful recrystallization.
What multiple of 10 is also a factor of 10
How can the level of pain you feel vary if a stimulus causes an all or none response?
what are the dimensions of the poster 1 half its current size A. 8ft x 16 ft B. 8ft x 12 ft C. 2 ft x 4ft D. 4ft x 4ft