starcsc1881 starcsc1881
  • 14-01-2020
  • Computers and Technology
contestada

The most common type of logical dependency to determine the sequence of project activities is "finish-to-finish" (FF).
a. True
b. False

Respuesta :

Limosa
Limosa Limosa
  • 15-01-2020

Answer:

Option B i.e., False is the correct option.

Explanation:

The following statement is incorrect because, It is the logical relationship not the logical dependency to recognize the series of the activity of the project details. So, that's why the following option is correct according to the given statement. the following relationship is also established between the specific schedule.

Answer Link

Otras preguntas

Canada's oil deposits are mostly located in:
Find the solution of the given initial value problem y'+2/ty=cost/t^2
How do I solve 2q+10=7q
Which state did not attend the Constitutional Convention? A) Rhode Island B) Pennsylvania C) Maryland D) Virginia
Which is a correctly written sentence, not a run-on? A. The gate to our backyard had been left open our dogs got out while we were gone. B. Our car wouldn't
When and where did U.S. and Soviet soldiers first come face to face?
The specific heat of silver is 0.06 cal/g°C. Fifty grams of silver will require _____ calories to raise the temperature 1°C.  A. 0.06 B. 3  C. 30  D. 833
Approximately, how many workers died in the construction of the canal?
Classify each of the reactants as a limiting reactant or an excess reactant for a reaction starting with five moles of each reactant. drag the appropriate items
How much land is washington university in square miles?