cricecrice6100 cricecrice6100
  • 12-02-2020
  • Social Studies
contestada

Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

what is 4 over 2 times 10 to the nine power
Campbell invests $10 in an account that earns 6% interest compounded monthly. A graph showing the growth of the money each year is shown. After how many years w
9/34 subtracted by 6:00
Jenny mixes 2/3 pound of almonds with 3/5 pound of dried fruit. To create more of the same mixture, how many pounds of almonds does Jenny need to mix with one p
What is the third step in the prewriting process for an argumentative essay? forming a claim finding evidence developing a position organizing an outline
The entire stock of backpacks at hats and packs is on sale for 30% off Marybeth purchase a backpack that regularly cost $25 her brother bought a backpack that n
Emma is going camping. Each side triangle on her tent is 5 feet tall. The square base is 4 feet wide. What is the surface area of her tent?
Classify the following expression by degree and term: (2 points) x2y − 7xy + xyz + x
Voltaire was drawing attention to the dangers of which of the following
What lesson does Orson Welles want listeners to learn from his radio broadcast War of the Worlds?