kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Why was it important for slaves to learn to read and write?
Solve this system by graphing. y = 2x - 7 y = - 3x + 8 (3, -1) (4, 1) (0, 8) (0, -7)
A(n) _____ strategy refers to bypassing existing foreign channels of distribution by establishing and maintaining marketing and sales offices in foreign countri
Question 3 of 10 how can onomatopoeia be used as a form of synesthesia? a. the sound of the word can imitate a visual effect. b. the sound of the word can imita
A lighthouse sits at the wdge of a cliff. a ship at sea level is 550 m from the base of the cliff. the angle of elevation from sea level to the base of the ligh
What is a totalitarianism example?
physical geography, also known as
A lighthouse sits at the wdge of a cliff. a ship at sea level is 550 m from the base of the cliff. the angle of elevation from sea level to the base of the ligh
Which best expresses the main effect of the description of Dombey and his son? 1) the description shows that Dombey is happier now that Son is here. 2) the des
how do you graph y=x-2?