Answer:

49 minutes

Step-by-step explanation:

To find the average time the machine was down per day, we need to add up the total time taken and then divide by the number of days. Since there are 5 days, we have:

[tex]\frac{50 + 30 + 100 + 25 + 40}{5}[/tex]

[tex]= \frac{245}{5}[/tex]

= 49

So, the average time per day is 49 minutes.

Hope this helped! :)

Answer Link

Otras preguntas

Fracking involves _____ in order to force out natural gas under high pressure. a. excavating Earth’s surface b. pumping materials into a well deep underground
What is the 7th term of the sequence 3,12,48,192
what is 1,722 divided by 13
20 POINTS!!!PLEASE HELP!!! Math!!! Solve the equation. 1.) -1/2 = y -1 2.) -3π + w = 2π 3.) 1.2m = 0.6 4.) q + 2.7 + -0.9
Rate and unit rate for 7.96 for 5 pounds
What did american indians agree to do in exchange for the food and clothing offered by spanish mssions
What is the median number for the numbers 4, 8, 10, 5, 9
3^6/3^_ = 3^4 what is the missing value?
Fracking involves _____ in order to force out natural gas under high pressure. a. excavating Earth’s surface b. pumping materials into a well deep underground
Describe and correct the error 9+2x3=11x3=33 19-6+12=19-18=1