adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

Determine whether or not the vector field is conservative. If it is, find a function f such that F = ∇f. If the vector field is not conservative, enter NONE. F(
Imagine that a hypothetical life form is discovered on our moon and transported to Earth. On a hot day, this life form begins to sweat, and it is determined tha
Trans fatty acids are associated with
During the time a compact disc (CD) accelerates from rest to a constant rotational speed of 477 rev/min, it rotates through an angular displacement of 0.250 rev
why ATP contains a large amount of energy
Find the area of the equilateral triangle whose sides are 4 yd.
Select all the correct answers. What are the purposes of a prologue in a play? -to provide information about the inner thoughts and feelings of a c
A condensed income statement by product line for British Beverage Inc. indicated the following for King Cola for the past year: Sales $235,100 Cost of goods sol
YO PLZ HELP ASAP!!! MARKIN BRAINIEST!!!
Which describes a way that carbon is pulled out of the atmosphere?