The project manager is typically responsible for

Select one or more:
a. developing training manuals
b. assessing quality assurance
c. understanding requirements
d. reviewing qualitative metrics
e. initiating the project

Respuesta :

kkentertainment
kkentertainment kkentertainment
  • 13-01-2021

Answer:

A

Explanation:

developing training manuals

Answer Link

Otras preguntas

How to calculate 100MB at 56 Kbps to transfer time?
a ball is tossed vertically upward rises, reaches it's highest point, and then falls back to its starting point. during the time, the acceleration of the ball a
What two numbers has a lcm of 50
What is the meaning of open proportion?
What's needed to know Right now we are doing unit 1 which is about tensions in ropes and weight and stuff about newtons. We are taking a test tomorrow and I st
Express 230 in scientific notation
A 75 force is applied to the side of a crate resting on a level floor. The crate has a mass of 25kg. If the coefficient of static friction is .15, is the 75 N f
how must a projectile be launched in order to maximize its range?
how many atoms in C9H8O4
What does this mean?The levying money for or to use of the crown by pretense of prerogative,without grant of parliament, for long time, or in other manner than