cadencemarie7761 cadencemarie7761
  • 12-06-2021
  • Business
contestada

Let's assume a project has high up-front costs, and high benefits that occur far into the future. If the project uses a lower interest rate (a.k.a. discount rate) to evaluate the present value of net benefits of the project versus a higher interest (discount) rate, the project __________.

Respuesta :

maselekomotsumi15
maselekomotsumi15 maselekomotsumi15
  • 13-06-2021
Has higher front costs and high benefits
Answer Link

Otras preguntas

3. Vocabulary What does it mean for segments to be congruent? What does it mean for angles to be congruent?
Mr. Rawlings had 60 cookies he wanted to give each of his 16 grandchildren the same number of cookies what is the greatest number of whole cookies he could giv
i suck at this math i need help
instalación es a montaje como: a. plomero es a plomería b. perro es a colac. valiente es a cobarde d. anteojos es a lentes ​
Determine the vertex form of g(x) = x2 + 2x – 1. Which graph represents g(x)?
which expression is the same as 2^-3
What is virtual reality?
500 ml into cm Does anyone know the answer
Who made the civil rights
A transversal intersects two parallel lines. The measures of a pair of alternate interior angles are 5v and 2w. The measures of a pair of same-side exterior ang