chaudharyprapti68 chaudharyprapti68
  • 13-08-2021
  • Social Studies
contestada

3. Why are the national heritages of Nepal demolished by the Earthquake 2072 B.S. need to be renovated built in their original structures? Mention any four reasons city in brief​

Respuesta :

nuevohillary
nuevohillary nuevohillary
  • 13-08-2021

Answer:

1. the national herotages of nepal need to be renovated built in their original structures because they need it.okay

2.they don't need to demolished it by the earthquake 2072 B.S.

3.?

4?

Answer Link

Otras preguntas

Memories of a Memory Have you ever witnessed something amazing, shocking or surprising and found when describing the event that your story seems to change the m
what will be the resistance of the wire if the jocky is pointing at 24cm from the initial
3 3/5 times (-8 1/3)
trapezoid ABCD is similar to rectangle EFGH. Side CD is congruent to side _____.​
What volume of air at 25°C and 1.00 atm can he stored in a 10.0 L high-pressure air tank if compressed to 25°C and 175 atm?
After Hitler rejected British and French concessions to give Germany parts of the Sudetenland, the British people began to prepare for war. Bomb drills were hel
Which list orders -3.216, 5.34, -3.62, -1.8, 5.4 from greatest to least
On the right triangle shown below, calculate the height of the traffic light. Round your answer to the nearest whole number. Enter the value without units.
Please answer this correctly
Steve issues a 30-day negotiable promissory note, payable to the order of Henry, to cover the cost of Henry buying a car for Steve's racing operation. Steve sig