abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

You have a $926 balance on your credit card account. the minimum payment on your account is 2 percent of the latest balance or $20, whichever is greater. what w
Mali was introduced to the Islamic culture by
Which one is it A. b. C. or D.
What factor affects the polarization of light by scattering?
Certain antibacterial soap kill 99% of the bacteria present on heand. Constant use of these soaps could be harmful over time because
When do statisticians use probability sampling?
a cube of gold (density = 19.3 g/cm cubed) is measured and the length of its side is 5.00 cm. what is the mass of the cube?
A thin rod has a length of 0.25 m and rotates in a circle on a frictionless tabletop. the axis is perpendicular to the length of the rod at one of its ends. the
Jake lives in the Northern Hemisphere. His cousin, Adriane, lives in the Southern Hemisphere. If it is March 20 (spring equinox) where Jake lives, which time of
In the late 1700s, the passage of the Northwest Ordinance allowed for the