hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Any substance composed of two or more elements that are chemically combined in a fixed proportion is (1) an isomer (3) a solution (2) an isotope (4) a compound
how is it possible for a compound to both have ionic and covalent bonds
Sports beverages should ideally contain A. water, protein, calcium, and magnesium. B. water, carbohydrates, potassium, and sodium. C. water, sodium, and calciu
27 divided 32 = ? Help
Gretchen and Mika are involved in a relay race. Both runners are at the same point on the course when Gretchen realizes that she dropped her baton and has to t
what was the impact of the Magna Carta view of government
… More than 30 years after “Year Zero” and more than a decade after the “return to democracy,” Cambodia remains in a league of its own — miserable, corrupt and
Where is the hydaspes river location
how is the electoral college related to the president
Really need help lol... Kristin lives in Alaska. She drives a car with a 12-gallon fuel tank. When Kristin fills her empty gas tank in Alaska, she has to pay a