hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

Q. Which of the following best describes why the Fairness Doctrine (with the exception of the "political editorial" and "personal attack" rules) did not contro
What are the different mathematical relationships in data?
The solution to 2x - 5 = 27 is also a solution of which of the following equations? 3 + 5x = 58 3x - 2 = 31 2x + 3 = 35 27 - 2x = 5
Ben wants to buy 2 blue sweaters for 119$ and 3 brown sweaters for 44$ each how much will ben spend on his five sweaters?
A system of equations is graphed on the coordinate plane. y=−x+5 y=2x−1 What is the solution to the system of equations? PLEASE SHOW WORK AND EXPLAIN WILL GIVE
5x 20 and the. multiplicative inverse of 5
A man climbs a wall that has a height of 8.4 meters and gave the potential energy of 4620 joules. His mass is about_____ kilograms?
What are the Holy Sonnets? A) nineteen poems about God B) John Donne’s poems, which contain metaphysical conceits C) John Donne’s body of work D) select poems c
My teacher said that 9+10 could equal 21 TELL me how
Which sentence uses correct capitalization? the beatles' "yesterday" is the most covered song in all of popular music. the beatles' "yesterday" is the most cove