wanakachakaren17
wanakachakaren17 wanakachakaren17
  • 03-12-2021
  • Mathematics
contestada

if 10 man can work 6hours.How many more men are needed towork in 4 hours​

Respuesta :

mathstudent55
mathstudent55 mathstudent55
  • 03-12-2021

Answer:

5 more men

Step-by-step explanation:

10 men do a job in 6 hours.

To do the job in 2 hours, 1/3 of the time, you need 3 times as many men.

30 men do a job in 2 hours.

To do the job in twice the time, 4 hours, you need half the men.

15 men do a job in 4 hours.

15 men - 10 men = 5 men

You need 5 more men.

Answer Link

Otras preguntas

which of the following is the best example of the tragedy of the commons
xaviers house is located at a point ( 4,6 ). michaels house is 10 blocks west ans two blocks south xaviers house. what are the coordinates of Michaels house
Para escuchar la música en la computadora, necesito ________________.
The family size bottle of sunscreen holds 12 fluid ounces (\text{fl oz})(fl oz)left parenthesis, f, l, space, o, z, right parenthesis of sunscreen. The regular
What is the name of the positively charged particle in the center of an atom
A pension fund invests $55,400 in utility stocks and earns 14% per year on the investment. How much money is earned per year?
when is it productive to set up a folder system for filing emails?
In the early 1900s, collaboration made this discovery possible. A.the heart-lung machine B.the Internet C.insulin to treat diabetes D.anesthesia
Plz help with number 1
Two angles are complementary angles if the sum of their measure is 90 degrees. Angle A and angle B are complementary angles, and angle A is 12 degrees more than