homehelp22 homehelp22
  • 15-12-2021
  • Mathematics
contestada

A machine takes 4.8 hours to make
8 parts. A that rate, how many parts
can the machine make in 24.6 hours?

Respuesta :

Jen2praise
Jen2praise Jen2praise
  • 15-12-2021

Answer:

41 parts

Step-by-step explanation:

A machine takes 4.8 hours to make 8 parts. At that rate, how many parts can the machine make in 24.6 hours?

The answer is 41 parts

because 24.6 divided by 4.8 is 5.125. And 5.125 multiplied by 8 equals 41 

Answer Link
ironmanlaser624 ironmanlaser624
  • 15-12-2021

Answer: 41 parts.

Step-by-step explanation: 8/4.8 = 1 and 2/3 so you times 24.6 by 1 and 2/3 and you get 41

Answer Link

Otras preguntas

A model for tumor growth is given by the Gompertz equation dV dt = a (In b-, In V) V where a >0 and b >0 are constants and V is the volume of the tumor me
The type of good for which the consumer compares several alternatives on such criteria as price, quality, and style is a(n) A. shopping product. B. B2B product.
2x+3y-4=x+5 solve for y=my+b
What type of chart is a histogram which shows the population in different age and gender groups for a country
Describe circulation of the heart
Describe the role of hormones in puberty help asap!!!
3 types of reactions that can be catalyze by enzymes
What is the slope of a line perpendicular to the line whose equation is y = 2x + 5? slope = -1 slope = - slope = -2
A shipment of 6 1/4 tons of sugar is separated into containers of equal size. If the shipment fills 5 containers, how much sugar can one container hold
What is the slope of a line perpendicular to the line whose equation is y = 2x + 5? slope = -1 slope = - slope = -2