kkgabby12 kkgabby12
  • 15-12-2021
  • Engineering
contestada

Engineers plan to develop a new drill for use on oil rigs.
What should the engineers do first in order to develop the
new drill

Respuesta :

Аноним Аноним
  • 15-12-2021

Answer:

Conduct research on features for a new drill

Explanation:

Follow instagrm at ➜ mvnnyvibes

Answer Link

Otras preguntas

Economic development has no effect on the overall health of a country. True false
A spinner with 12 equal sections is spun. Each section is numbered 1 to 12. What Is the probability of landing on an odd number. A) 25% B) 75% C) 100% D) 50%
Addressing the families of the astronauts is mainly an appeal to
If a number is chosen at random from the numbers 1 to 20 inclusive, what is the probability that a single-digit number will be picked? ( give your answer in sim
How does the use of repetition affect the narrrator’s tone in this passage
What is the difference between 5d and d ⁵ ?
mention the name of a shrub tree that bear cones​
Por que se dice que los libros electrónicos son importantes en el área educativa ?
Delta airlines is consider purchase of two alternative planes. Plane A has an expected life of 5 years, will cost $100 million and will produce net cash flow of
18 What is the value of x? 3 10 2y + 4 4 6 10 + 2x 8