sahidfofana sahidfofana
  • 14-06-2022
  • Mathematics
contestada

A water well drilling rig has dug to a height of –60 feet after one full day of continuous use.
Assuming the rig drilled at a constant rate, what was the height of the drill after 15 hours? (Show your work)

Respuesta :

jiayi8164 jiayi8164
  • 14-06-2022
60/24*15 just like one day have 24 hours
Answer Link

Otras preguntas

POSSIBLE POINTS: 16.67 If a cylinder has a height of 16 cm and a base with a diameter of 12 cm. Find the lateral surface area. Round your final answer to the ne
Sia sells large candles for $3 each and small candles for $2 each. She sold 17 candles for $46.00. How many of each size candle did she sell? 4 small and 13 lar
anecdotas relacionadas con accidentes en bicleta o moto
Can you please answer fast
When should a patient get a X-Ray, MRI, CT-SCAN?
please help or im deasd
can someone make at least one paaghragh Explaing the best way to learn new things Composition BEST ONE GETS BRAINIEST
Peel paragraph on life in the Elizabethan era
How to solve this geometry show work pls
What phase is our sun in?