alyssawilmoth1
alyssawilmoth1 alyssawilmoth1
  • 15-09-2022
  • Mathematics
contestada

A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

How did the New deal affect the economic,political,social,and cultural aspect of American life
Wilson’s view of the postwar world was summed up in
What is first person point of view
what is a page margin and its types
Which word can replace the phrase "looked closely at" without changing the meaning of this sentence? The music executives looked closely at the lyrics of the s
Since the sun shines every day, there is a new supply of solar energy continuously. Oil and other fossil fuels take longer to be replenished. The time for new o
which equation represents a linear function​
Business owners sell_______________ to investors, which are shares in their companies. bonds dividends(wrong) corporations stocks
What languages were used officially? French and English Latin and French German and Latin English and German
A rectangular paperboard measuring 26 in long and 20 in wide has a semicircle cut out of it. Find the area of the paperboard that remains. Use the value 3.14