ceceshelby405 ceceshelby405
  • 02-09-2017
  • Business
contestada

It is estimated that a first time dui costs roughly ______ once all potential costs are factored in.

Respuesta :

quenbarr quenbarr
  • 15-09-2017
The estimated cost of first time DUI roughly around $1,000 dollars once the potential cost are factored in. The potential cost of a contract is the sum of all the estimated and actual cost of all the fees and reimbursable expenses associated with contact.
Answer Link

Otras preguntas

To draw attention to the gentle personality of the main character, the writer added a __________ to the script: someone who was harsh and loud in his attitude a
Cathedral organs ___ with large, harmonic sounds, while the tambourine is too shallow an instrument to produce more than a flat sound. A. advocate B. assent C.
what is the main function of nitrogen in the atmosphere
what happens to a liquid when it releases enough energy
how long will it take the train to travel 350 miles at this speed?
Which person has the most freedom to make his or her own lifestyle decisions? A -- Frieda is 10 years old and lives with her grandmother. B -- Vladimir is 3 yea
How do u do the order of operations again?
what was the new racial order proposed by nazis
find the equation of a line that is parallel to the line x=10 and the point (-4,4). The equation of the parallel line is ?
how are force, work, and distance related?