planjhariap6bqg4
planjhariap6bqg4 planjhariap6bqg4
  • 04-04-2018
  • Mathematics
contestada

8 men complete a work in 40 days. How many days will be taken to complete the samed work if 2 more men join them.

Respuesta :

rpband00
rpband00 rpband00
  • 04-04-2018
Hello there,

There were 8 men who completed a task in 40 days. If you divide 40/8 that is 5 so it took them 5 weeks to complete this task.

Now if you add two more men, that makes it 10 men to complete the work in 50 days. If you divide 50/10 that is 5.
10 days

Hope this helped!

Answer Link

Otras preguntas

Which has is produced when Mg(s) is added to HCI(aq)
Use the substation to solve the system of equations. Y=x+1.75 4x-2y=4
"Fifteen hundred years ago everybody knew the Earth was the center of the universe. Five hundred years ago, everybody knew the Earth was flat, and fifteen minut
Which of the following equations describes a line with an x-intercept of 3? A. x + y = −3 B. x − y = −3 C. x = 3
Please help with number 8 ASAP
The Golgi apparatus helps to maintain cellular homeostasis by ____ Question 13 options: A. controlling which proteins are synthesized during the cell cycle.
Which subatomic particle is electrically neutral and found in the nucleus of an atom? A. proton B. neutron C. electron D. orbital E. nucleus
Surface currents greatly affect the climate in many parts of the world.
Suppose that the function f(x) = 7x + 2 represents the number of cars that drive by in x minutes. How many cars will drive by in 10 minutes. A. 27B. 70C. 72D. 9
Which situation describes positive peer pressure?