bayneshoffman4439 bayneshoffman4439
  • 04-04-2018
  • Business
contestada

The initial assessment of feasibility is made in theâ ________ phase of the systems development life cycle.

a. requirements analysis

b. component design

c. system maintenance

d. implementation

e. system definition

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
a or d hope this helps
Answer Link

Otras preguntas

4.2meters= how many centimeter
What is the adjective in the following sentence? The yellow sun hung brightly in the sky. a. Brightly b. Sun c. Yellow d. Hung
What Role Does the Sun Play in Producing Winds And Ocean Currents
The process of chemical cycling is known as a biogeochemical cycle because it A. takes places over a long period of time B. withdraws the
PLEASE HELP I GIVE THANKS
What does hemostasis mean?
Graph the six terms of a finite series where a1 = -3 and r = 1.5.
Mrs.Henderson had 7/12dozen eggs in her refrigerator.Then she used 1/6 dozen eggs to make a cake.What fraction of a dozen is left?
what rule does static electricity follow
what is the mRNA sequence from 3 TACGGTAAGCATCTTGGCATAACCCCAATT 5