cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

HEY CAN ANYONE PLS ANSWER DIS MATH PROBLEM!!
Why might someone not consider a football a ball.List at least 3 reasons.​
The areaot a square is 36 cm? What is the side length, s?
Jeremiah wants to estimate the mean age of students at his large university. He'll sample n students and make a 95%, percent confidence interval for the mean ag
TWO SENTENCES!!!! What are the roles of an engineer?
Look at the chemical equation: Zn + 2HCl → ZnCl2 + H2 How many atoms of hydrogen (H) are present on both sides of the equation? 1 2 3 4
how many solutions to 3x^2 -5x+20=0 equation
14. Weathering and erosion occur when which two Earth system spheres interact? a. geosphere and biosphere b. atmosphere and hydrosphere c. biosphere and atmosph
A gas mixture has 10% O2, 50% Ar (40 gmw) and 40% Pu (244 gmw). What is the density of this mixture?
The value of a car reduces by 30% every 6 months. A car costs $15,000 when new. What is the value of the car after 2 years?